NC DB and PPP QBS Experts

After September’s program these acronyms mean so much more. James Smith, Executive Director of ACEC/NC, and David Crawford, Executive Vice President of AIA/NC gave us the lowdown when it comes to NC House Bill 857. Passed last year, this authorized three new delivery methods for non-transportation projects in NC – design-build, design-build-bridging and public private partnerships. It also strengthened qualifications based selection by removing some of the loopholes. Next up on the agenda was NC House Bill 1043 – passed this year, it clarifies the sometimes confusing requirements for pre-qualification of bidders on construction projects. Finally, we talked PPPs. Now public entities have the option to use this as a funding method on projects. And remember – PPPs are a funding mechanism, not a delivery method. Thanks to everyone who attended! And be sure to check out the photos from the event.

Photo Gallery

Access Token not set. You can generate Access Tokens for your Page or Profile on fb.srizon.com. After generating the access token, insert it on the backend

 

Share This Article